WEKO3
アイテム
{"_buckets": {"deposit": "0e4c0a1d-8063-4c2e-ac9c-b0338ab2969d"}, "_deposit": {"created_by": 1, "id": "895", "owners": [1], "pid": {"revision_id": 0, "type": "depid", "value": "895"}, "status": "published"}, "_oai": {"id": "oai:omu.repo.nii.ac.jp:00000895", "sets": ["130", "199"]}, "author_link": ["3437"], "item_2_biblio_info_7": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2005-03-31", "bibliographicIssueDateType": "Issued"}, "bibliographicPageEnd": "39", "bibliographicPageStart": "29", "bibliographicVolumeNumber": "7", "bibliographic_titles": [{"bibliographic_title": "Journal of economics, business and law"}]}]}, "item_2_description_16": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_description": "application/pdf", "subitem_description_type": "Other"}]}, "item_2_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "The market needs have urged the production system to shift from mass production to flexible manufacturing with short period lead time and/or special specification of products. In order to meet these requirements, integrated system of production, sales and distribution is needed. Three critical success factors below are pointed out for the success of this system. (1) More elaborate sales planning Generally, sales is too roughly planned and it causes rough production planning. (2) Rapid making and remaking of production planning Changing of production plan takes much time and it is not easy to coordinate departments. (3) Coordination among production, sales and distribution department As is often the case with coordination among departments, each department has its own way and makes trouble with customers by inconsistent reply. To cope with these difficulties, following schemes would be useful. a. Order-made sales forecasting system Construct elaborate sales planning system using order-made sales forecasting system b. Production planning system using production planning simulator Utilizing production planning simulator enables rapid making and remaking of production plan c. Utilizing production planning simulator and setting up a coordination center By these, departments can be coordinated rapidly and smoothly Concepts of these CSFs are stated with case studies.", "subitem_description_type": "Abstract"}]}, "item_2_description_6": {"attribute_name": "引用", "attribute_value_mlt": [{"subitem_description": "Journal of economics, business and law. 2005, 7, p.29-39", "subitem_description_type": "Other"}]}, "item_2_identifier_registration": {"attribute_name": "ID登録", "attribute_value_mlt": [{"subitem_identifier_reg_text": "10.24729/00000888", "subitem_identifier_reg_type": "JaLC"}]}, "item_2_publisher_34": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "College of Economics, Osaka Prefecture University"}]}, "item_2_source_id_10": {"attribute_name": "書誌レコードID", "attribute_value_mlt": [{"subitem_source_identifier": "AA11338387", "subitem_source_identifier_type": "NCID"}]}, "item_2_source_id_8": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "1344-770X", "subitem_source_identifier_type": "ISSN"}]}, "item_2_version_type_17": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_970fb48d4fbd8a85", "subitem_version_type": "VoR"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Takeyasu, Kazuhiro"}], "nameIdentifiers": [{"nameIdentifier": "3437", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2019-07-29"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "KJ00004765300.pdf", "filesize": [{"value": "536.7 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 536700.0, "url": {"label": "KJ00004765300.pdf", "url": "https://omu.repo.nii.ac.jp/record/895/files/KJ00004765300.pdf"}, "version_id": "c5dbfb76-1fef-410d-b98c-c79e9ab56709"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "Sales Forecast", "subitem_subject_scheme": "Other"}, {"subitem_subject": "production Planning", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Scheduling System", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Simulator", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Critical Success Factors of Integrated System of Production, Sales and Distribution", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Critical Success Factors of Integrated System of Production, Sales and Distribution"}]}, "item_type_id": "2", "owner": "1", "path": ["130", "199"], "permalink_uri": "https://doi.org/10.24729/00000888", "pubdate": {"attribute_name": "公開日", "attribute_value": "2009-08-25"}, "publish_date": "2009-08-25", "publish_status": "0", "recid": "895", "relation": {}, "relation_version_is_last": true, "title": ["Critical Success Factors of Integrated System of Production, Sales and Distribution"], "weko_shared_id": -1}
Critical Success Factors of Integrated System of Production, Sales and Distribution
https://doi.org/10.24729/00000888
https://doi.org/10.24729/0000088898ea3056-f151-44ae-b4e2-cb1ca04208d4
名前 / ファイル | ライセンス | アクション |
---|---|---|
KJ00004765300.pdf (536.7 kB)
|
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2009-08-25 | |||||
タイトル | ||||||
タイトル | Critical Success Factors of Integrated System of Production, Sales and Distribution | |||||
言語 | ||||||
言語 | eng | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Sales Forecast | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | production Planning | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Scheduling System | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Simulator | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
ID登録 | ||||||
ID登録 | 10.24729/00000888 | |||||
ID登録タイプ | JaLC | |||||
著者 |
Takeyasu, Kazuhiro
× Takeyasu, Kazuhiro |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | The market needs have urged the production system to shift from mass production to flexible manufacturing with short period lead time and/or special specification of products. In order to meet these requirements, integrated system of production, sales and distribution is needed. Three critical success factors below are pointed out for the success of this system. (1) More elaborate sales planning Generally, sales is too roughly planned and it causes rough production planning. (2) Rapid making and remaking of production planning Changing of production plan takes much time and it is not easy to coordinate departments. (3) Coordination among production, sales and distribution department As is often the case with coordination among departments, each department has its own way and makes trouble with customers by inconsistent reply. To cope with these difficulties, following schemes would be useful. a. Order-made sales forecasting system Construct elaborate sales planning system using order-made sales forecasting system b. Production planning system using production planning simulator Utilizing production planning simulator enables rapid making and remaking of production plan c. Utilizing production planning simulator and setting up a coordination center By these, departments can be coordinated rapidly and smoothly Concepts of these CSFs are stated with case studies. | |||||
引用 | ||||||
内容記述タイプ | Other | |||||
内容記述 | Journal of economics, business and law. 2005, 7, p.29-39 | |||||
書誌情報 |
Journal of economics, business and law 巻 7, p. 29-39, 発行日 2005-03-31 |
|||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 1344-770X | |||||
書誌レコードID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AA11338387 | |||||
フォーマット | ||||||
内容記述タイプ | Other | |||||
内容記述 | application/pdf | |||||
著者版フラグ | ||||||
出版タイプ | VoR | |||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |||||
出版者 | ||||||
出版者 | College of Economics, Osaka Prefecture University |